NHAI Project

Get Access to our Annual Bidding Report!

DBL received LOA for road project in Gujarat from NHAI

Share This On :

Share on facebook
Share on twitter
Share on linkedin
Share on whatsapp

Four Laning of Dhrol-Bhadra Patiya Section NH-151A (between Ex. Km 5+700 to Km 13+600 of SH-25) and Bhadra patiya – Pipaliya section of NH-151A (Between Ex 73+000 to Km 44+800 and Ex. Km 38+350 to 24+000 of CSH-6) in Gujarat through Public Private Partnership (PPP) (The project) on design,build,operate and transfer (the DBOT Annuity or Hybrid Annuity) basis.

Bid Prioject Cost 882.00 Cr.
Mode : Hybrid Annuity
1st Year O&M (INR in Cr.) 3.00
Completion period and operation period 24 Month / Operation period 15 Years from COD
Leangth approxx 50.45 KM
Date of LOA on 14.12.2020

Contractor Name : Dilip Buildcon limited

0 comment

Devender phogat 16/04/2021 - 4:34 pm

Earth work so plz contact

  • Phone Number: 9812872406
Reply

Leave a Comment

Related Projects

Road Projects

National Highway

State Highway

Tunnel Projects

Bridge Projects

More Projects

झारखण्ड राज्य में रू0 3,550 करोड़ की लागत से कुल 539 किलोमीटर लंबी कुल 21 सड़क परियोजनाओं का लोकार्पण एवं षिलान्यास का कार्यक्रम

श्री नितिन गडकरी जी, माननीय मंत्री सड़क परिवहन एवं राजमार्ग मंत्रालय, के कर कमलों

Read More »